{"id":5317,"date":"2026-11-25T16:39:57","date_gmt":"2026-11-25T06:39:57","guid":{"rendered":"https:\/\/www.theonsitemanager.com.au\/news\/the-onsite-manager-report-episode-4-hurry-up-and-wait\/"},"modified":"2026-11-25T16:39:57","modified_gmt":"2026-11-25T06:39:57","slug":"the-onsite-manager-report-episode-4-hurry-up-and-wait","status":"publish","type":"post","link":"https:\/\/www.theonsitemanager.com.au\/news\/the-onsite-manager-report-episode-4-hurry-up-and-wait\/","title":{"rendered":"The Onsite Manager Report, Episode 4: Hurry Up and Wait? Concrete Cancer and Acting Reasonably"},"content":{"rendered":"<p><em>By Tom from TheOnsiteManager.com.au<\/em><\/p>\n<p>Welcome to <strong>The Onsite Manager Report<\/strong>, a short explainer series on the rulings, rules and risks that matter to Queensland onsite managers. In Episode 4, Nick looks at a recent BCCM adjudicator&#8217;s order that every committee facing major remedial works should know: when concrete cancer shows up, how fast does a body corporate have to move, and what does &#8216;acting reasonably&#8217; look like?<\/p>\n<figure class=\"wp-block-video\"><video controls preload=\"metadata\" poster=\"https:\/\/www.theonsitemanager.com.au\/news\/wp-content\/uploads\/2026\/11\/thumb_16x9-3.jpg\" src=\"https:\/\/www.theonsitemanager.com.au\/news\/wp-content\/uploads\/2026\/11\/episode4_16x9_web.mp4\" style=\"width:100%;height:auto\"><\/video><figcaption>The Onsite Manager Report, Episode 4 (2 min 19 sec)<\/figcaption><\/figure>\n<h2>What happened<\/h2>\n<p>Carrington Court &#8211; Main Beach (CTS 10447) is a community titles scheme on the Gold Coast under the Accommodation Module. There is concrete spalling, often called concrete cancer, at the building.<\/p>\n<p>A lot owner applied to the Office of the Commissioner for Body Corporate and Community Management for orders that the body corporate take &#8220;immediate action&#8221; to repair the affected concrete, restore waterproofing and repair, and paint the building. The owner relied on a painter&#8217;s email of 29 January 2026 noting spalling and peeling paint on balconies; a structural analysis using ground penetrating radar on the basement and level 10 slabs on 11 February 2026, which reported &#8220;visible signs consistent with concrete cancer&#8221; and recommended further assessment of all floors; and a preliminary building condition report of 9 March 2026 recommending remediation within three months.<\/p>\n<p>The body corporate&#8217;s committee answered with a report from building diagnostics and remediation consultants dated 7 May 2026, which noted &#8220;widespread and systemic&#8221; spalling and recommended extensive repairs; draft tender documents dated 19 June 2026 covering concrete spalling works, window and balcony door replacement, balcony tiling, balustrade replacement, crack stitching, render repairs and facade painting; and minutes of a committee meeting on 26 June 2026 directing the consultant to amend the draft scope of works. The owner complained of &#8220;stalling and lack of transparency&#8221;.<\/p>\n<h2>The adjudicator&#x27;s decision (4 August 2026)<\/h2>\n<ul>\n<li><strong>The statutory duty was being met.<\/strong> The adjudicator said the body corporate was &#8220;plainly acting to meet its statutory obligation&#8221; to maintain foundation structures, roofing structures and essential supporting framework in a structurally sound condition (Accommodation Module, s 170(2)(b)).<\/li>\n<li><strong>The test is acting reasonably.<\/strong> The adjudicator treated the request for &#8220;immediate action&#8221; as an argument that the body corporate was not acting reasonably (BCCM Act ss 94(2) and 100(5)), and found &#8220;little evidence that greater haste is necessary&#8221;. The only report calling for repairs within three months was based on a &#8220;preliminary visual inspection&#8221; only.<\/li>\n<li><strong>The expert&#8217;s process takes time.<\/strong> The body corporate&#8217;s consultant did not say the works were urgent. It recommended a detailed remedial specification and scope of works, at least three tenders and a transparent assessment before deciding the way forward. Waterproofing and painting were already in the tender specifications.<\/li>\n<li><strong>Result.<\/strong> &#8220;The body corporate appears to be acting reasonably by following the advice of its experts. I am not persuaded it is unreasonable not to proceed more quickly.&#8221; The application was dismissed.<\/li>\n<\/ul>\n<h2>Key takeaways for onsite managers and committees<\/h2>\n<ul>\n<li>Get independent expert advice on remedial works, and follow it.<\/li>\n<li>Scope the job, tender it properly and minute every step: the paper trail carried the day here.<\/li>\n<li>Keep owners informed. Here, the owner complained of &#8220;stalling and lack of transparency&#8221;.<\/li>\n<li>The order does not say slow is always fine. If your expert says the works are urgent, act urgently.<\/li>\n<\/ul>\n<h2>Case citation<\/h2>\n<p><em>Carrington Court &#8211; Main Beach<\/em> [2026] QBCCMCmr 257 (delivered 4 August 2026). <a href=\"https:\/\/www.austlii.edu.au\/au\/cases\/qld\/QBCCMCmr\/2026\/257.html\" rel=\"noopener\">Read the decision on AustLII<\/a>.<\/p>\n<p>For management rights news, listings and resources, visit <a href=\"https:\/\/www.theonsitemanager.com.au\">theonsitemanager.com.au<\/a>. Onsite managers can also <a href=\"https:\/\/www.theonsitemanager.com.au\/join\">join TheOnsiteManager here<\/a>.<\/p>\n<p><em>General information only, not legal advice. Outcomes turn on the facts and the scheme documents. Speak to a strata solicitor or the Office of the Commissioner for Body Corporate and Community Management (BCCM) before acting.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Episode 4 of The Onsite Manager Report: a lot owner asked a BCCM adjudicator to order immediate repairs to concrete spalling at a Main Beach tower. In Carrington Court &#8211; Main Beach [2026] QBCCMCmr 257, the adjudicator dismissed the application: the body corporate appeared to be acting reasonably by following the advice of its experts.<\/p>\n","protected":false},"author":1294,"featured_media":5310,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_mbp_gutenberg_autopost":false,"footnotes":""},"categories":[8,7,2],"tags":[],"class_list":["post-5317","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-body-corporate","category-general-interest","category-legal"],"_links":{"self":[{"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/posts\/5317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/users\/1294"}],"replies":[{"embeddable":true,"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/comments?post=5317"}],"version-history":[{"count":0,"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/posts\/5317\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/media\/5310"}],"wp:attachment":[{"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/media?parent=5317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/categories?post=5317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.theonsitemanager.com.au\/news\/wp-json\/wp\/v2\/tags?post=5317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}