Welcome to The Onsite Manager Report, a short explainer series on the rulings, rules and risks that matter to Queensland onsite managers. In Episode 4, Nick looks at a recent BCCM adjudicator’s order that every committee facing major remedial works should know: when concrete cancer shows up, how fast does a body corporate have to move, and what does ‘acting reasonably’ look like?

The Onsite Manager Report, Episode 4 (2 min 19 sec)

What happened

Carrington Court – Main Beach (CTS 10447) is a community titles scheme on the Gold Coast under the Accommodation Module. There is concrete spalling, often called concrete cancer, at the building.

A lot owner applied to the Office of the Commissioner for Body Corporate and Community Management for orders that the body corporate take “immediate action” to repair the affected concrete, restore waterproofing and repair, and paint the building. The owner relied on a painter’s email of 29 January 2026 noting spalling and peeling paint on balconies; a structural analysis using ground penetrating radar on the basement and level 10 slabs on 11 February 2026, which reported “visible signs consistent with concrete cancer” and recommended further assessment of all floors; and a preliminary building condition report of 9 March 2026 recommending remediation within three months.

The body corporate’s committee answered with a report from building diagnostics and remediation consultants dated 7 May 2026, which noted “widespread and systemic” spalling and recommended extensive repairs; draft tender documents dated 19 June 2026 covering concrete spalling works, window and balcony door replacement, balcony tiling, balustrade replacement, crack stitching, render repairs and facade painting; and minutes of a committee meeting on 26 June 2026 directing the consultant to amend the draft scope of works. The owner complained of “stalling and lack of transparency”.

The adjudicator's decision (4 August 2026)

  • The statutory duty was being met. The adjudicator said the body corporate was “plainly acting to meet its statutory obligation” to maintain foundation structures, roofing structures and essential supporting framework in a structurally sound condition (Accommodation Module, s 170(2)(b)).
  • The test is acting reasonably. The adjudicator treated the request for “immediate action” as an argument that the body corporate was not acting reasonably (BCCM Act ss 94(2) and 100(5)), and found “little evidence that greater haste is necessary”. The only report calling for repairs within three months was based on a “preliminary visual inspection” only.
  • The expert’s process takes time. The body corporate’s consultant did not say the works were urgent. It recommended a detailed remedial specification and scope of works, at least three tenders and a transparent assessment before deciding the way forward. Waterproofing and painting were already in the tender specifications.
  • Result. “The body corporate appears to be acting reasonably by following the advice of its experts. I am not persuaded it is unreasonable not to proceed more quickly.” The application was dismissed.

Key takeaways for onsite managers and committees

  • Get independent expert advice on remedial works, and follow it.
  • Scope the job, tender it properly and minute every step: the paper trail carried the day here.
  • Keep owners informed. Here, the owner complained of “stalling and lack of transparency”.
  • The order does not say slow is always fine. If your expert says the works are urgent, act urgently.

Case citation

Carrington Court – Main Beach [2026] QBCCMCmr 257 (delivered 4 August 2026). Read the decision on AustLII.

For management rights news, listings and resources, visit theonsitemanager.com.au. Onsite managers can also join TheOnsiteManager here.

General information only, not legal advice. Outcomes turn on the facts and the scheme documents. Speak to a strata solicitor or the Office of the Commissioner for Body Corporate and Community Management (BCCM) before acting.

← Rental Applications and Tenant Privacy in Queensland: What Onsite Managers Can Ask For, Keep and Must Destroy
We're recruiting property software and IT support suppliers now. Do you offer this service? List your business